Quick answer

Do hardscaping like patios, pools and retaining walls first. Install sprinklers next, with landscaping before or after, but put in any shrub zone before mulch, weed barrier or rock. A fence can go in before or after the sprinklers if you leave a 48 inch gate opening. Install sod last, after the irrigation.

Planning a big yard makeover with a new patio, fence, landscaping, sprinklers and sod? The order you do things in matters. Get it wrong and you can end up paying to tear out new sod, reroute sprinkler lines or redo mulch beds. Here is the sequence Maddox Irrigation recommends after decades of installing sprinkler systems in Metro Detroit.

The recommended order

  1. Hardscaping first. Patios, pools and retaining walls go in before anything else.
  2. Sprinklers and landscaping. Landscaping can be installed before or after your sprinkler system, with one important exception for shrub beds (see below).
  3. Fence before or after. Fence installation can happen before or after the sprinklers. If the fence goes in first, leave a 48 inch gate opening so our equipment can get into the yard.
  4. Sod last. Sod must be installed after the irrigation.

Shrub beds: hold the mulch

If you are planning a shrub zone, do not put down mulch, install weed barrier or lay rock until the shrub zone has been installed. Those drip and shrub lines need to go in first. Learn more about drip irrigation and shrub zones.

Can sprinklers and sod go in before the patio?

You can install sprinklers and sod before any hardscaping, but changes may need to be made later when the patio or walls go in, and those changes come at an additional cost. If you can, finish the hardscaping first.

Before we dig: MISS DIG

MISS DIG is Michigan's statewide one-call utility notification system. Our office contacts MISS DIG at least three business days before digging so utility companies can mark the approximate location of underground lines at your address. Please do not remove any markings. If weather washes them away, call our office right away so we can have them marked again.

After installation: what to expect

  • Most sprinkler installations take 3 to 4 hours, and 90% are completed in one day.
  • Plan to be home for about 2 hours so the crew can connect the plumbing and timer inside.
  • Depending on the season and the condition of your lawn, it will be back to normal or better in 2 to 4 weeks.
  • After your sod goes in, Maddox comes back to adjust your sprinkler heads at no extra cost.

Watering new sod or hydroseed

Follow your sod company's recommendations first. Depending on the weather, water 2 or 3 times per day: twice a day in a rainy stretch and 3 times a day when it is sunny and hot. Keep the roots of new sod wet for 2 weeks. Standing water means you are overwatering, and yellowing means it needs a little more. For hydroseed, follow the hydroseeding company's instructions first. Typically that means watering 4 times per day until the area starts to puddle, about 5 to 7 minutes per zone, without washing the seed away.

Ready to plan your project? Learn more about sprinkler system installation or request a free estimate.